View Single Post
Old 07-03-2009, 12:23 PM   #5 (permalink)
Ashmen
Beams Owners Group
 
Ashmen's Avatar
 
Join Date: Sep 2008
Location: AL
Posts: 381
Thanks: 10
Thanked 18 Times in 17 Posts





I'll be running the alternator in the lower position, and swapping pulleys so there is no interference issues. A month turn over time isn't much of a problem, there is still some prep work to be done.
Ashmen is offline   Reply With Quote
 
Page generated in 0.21404 seconds with 16 queries