View Single Post
Old 07-23-2009, 03:07 AM   #10 (permalink)
mrturrari
I <3 my 5sfe
 
Join Date: Mar 2005
Location: Salt Lake City, Utah
Posts: 655
Thanks: 2
Thanked 170 Times in 113 Posts





I finished the rest of the welding tonight and port matched it to the TB. I also drilled and tapped most of the vacuum ports and the place where the throttle cable attaches. All that is left on the manifold itself is for me to get a couple of 1/8" vacuum ports and drill and tap for them. Here are more pics:







I'm hoping I can finish this project up this weekend but we'll see.
mrturrari is offline   Reply With Quote
 
Page generated in 0.20179 seconds with 16 queries