Well the engine has started to be built

and ive started to dissasemble my car. Bumpers , engine lid and boot lid and under trays are coming off.
Next step is to drop the fuel tank and add the Walbro. Once done i want to run her and make sure everything is ok. Once established it off to the auto electrician to discharge my air con. Then a bit more fabricating to mount my Bosch water pump up front near the air con expander and run copper pipes from the front to the back for my A/W intercooler set up.
Instead of running wires from the MoTec im going to add a relay and fuse in the frunk fuse box in the Spot light seats as i dont have any spot lights . That way i can use the factory wiring as the loom already goes to the front left and right locations.
So yes its finally happening but it will still be a while