Not really that cool but completely disassembled the rear 93T brakes cleaned and wire brushed them in the parts washer for a good 30+ minutes and them painted them. I was going to powder coat them but there is a bearing for the eBrake and I wasn't sure if it came in the rebuild kit so I just decided to paint. Anyway, the rebuild kit should be here along with all the rest of the Toyota order I got. My powdercoat batch is said to be done wednesday cause the owner likes me and I've spent a lot already with him. lol Pays to pay I guess. Head should be done friday as well, sooooo with that my car will be back on it's wheels and the motor fully assembled by sunday save for the Greddy t-belt since it's still on a boat heading over. I'm thinking 2 weeks and my car will be loaded up on on the trailer and ready to head to texAssss. Also got my water hardlines all welded up and fittings welded on as well as the valve cover welded up how I wanted.
Used a cermic high heat paint that's honestly almost as tough as pc.
