well its close to being done i got the alt bracket made the crank pulley is cut down to one (you'll see in the the pics) the intake painted (and decaled) the throttle body back on the fuel rail is done vac ports drilled and tapted timing belt is done motor wise its just the turbo set up and cam shim right and valve covers
http://www.mr2.com/forums/attachment...1&d=1256443999